img

INFRASTRUCTURE

Our experience covers both road and rail including the vehicle impact barriers, 10 m high piled retaining walls and revetments to the Main South Road upgrade project at Darlington and various rail projects including crossing loops at Callington and Ambleside, rail extensions and grade separations in Melbourne and, numerous bridge capacity assessments for ARTC.

WATER

Experience in water infrastructure includes the detailed structural design of what was then the largest air regulated siphon weir to be constructed in the UK and having a maximum throughput of 273 cumecs, flow regulating structures around Kingston SE and assessment of reservoirs for WaterNSW for the 1/10,000 event earthquake to satisfy the Dam Safety Committee.

img